Sr No | Penalty Description | Rate |
1
|
Non installation/faulty Digital water Flow meter with telemetry
system.
|
200000.00
|
2
|
Non disclosure/ construction of additional groundwater abstraction structures (Functional / Non-Functional Structures.)
|
200000.00
|
3
|
Non disclosure/ construction of additional groundwater abstraction structures(b) Defunct/Abandoned)
|
100000.00
|
4
|
Reporting of fresh water zones as Brackish / Saline zones in application.
|
200000.00
|
5
|
Non Installation of Piezometer.
|
200000.00
|
6
|
Non Installation/faulty DWLR/Telemetry system
|
100000.00
|
7
|
Non Construction/Inadequate capacity of Recharge / Water conservation structures.
|
500000.00
|
8
|
Non maintenance of Recharge structures.
|
200000.00
|
9
|
Injection of treated/untreated water into the aquifer system.
Note: In addition to penalty, the proponent shall bear the cost of aquifer remediation as per the provisions of Environment(Protection) Act,1886.
|
1000000.00
|
10
|
Non Submission of Water level/Water quality Data.
|
50000.00
|
11
|
Non-maintenance of log book of daily withdrawal/non submission of Groundwater abstraction data.
|
50000.00
|
12
|
Non submission of photograph of recharge structure(s).
|
50000.00
|
13
|
Non Submission of Self Compliance report.
|
100000.00
|
14
|
Construction of groundwater abstraction structures by un authorized/unregistered Drilling Rigs (per structures).
|
100000.00
|
15
|
Non registration of water supply tankers.
|
500000.00
|
16
|
Non registration of drilling rigs.
|
200000.00
|
17
|
Late submission
|
100000.00
|
18
|
Revival charges
|
10000.00
|
19
|
Submission of false information / undertaking
|
100000.00
|